          |  | Marine 
            Civil Works |  |  |   
          |  | 
              
                |  | The firm has successful completed 
                  the design and supervision of several marine works in the Kingdom 
                  of Thailand. Apart from numerous bundings and quaywalls along 
                  the canals and rivers all over the country, it has been commissioned 
                  to do the feasibility study, marine survey, bathy-metric chart, 
                  silting study, conceptual design, negotiation with mechanical 
                  equipment suppliers, detailed designs, and supervision of construction 
                  of the Mah - BoonKrong Terminal at Sri Raja involving some 3,000 
                  metres of jetty and a unique fender system for the offshore 
                  platforms capable of berthing 100,000 tons bulk carriers in 
                  open water. All are locally fabricated at considerable saving 
                  in time and budget. |  |  |   
          |  |  |   
          | Maptaput 
            Deep Sea Port, Rayong 
 |  |   
          | The firm has also designed several river-front loading and offloading 
            facilities for various commodities from cement to agricultural products. 
            We have established specifications concerning protective coatings 
            for structural steel work and
 also for reinforced concrete structures exposed to corrosive atmospheres.
 |  |  |  |   
          | Break 
            water Groin for Jalaprathan Cement Factory, Pethburi
 |  |   
          |  |  | 
              
                |  | In year 1974, the firm was 
                  commissioned by the Mah Boonkrong Drying & Silo Co.,Ltd. to assist them in developing 
                  an efficient system of handling the growing export business 
                  of tapioca pellets from Thailand to the Europort at Amsterdam. 
                  For such a long haul and low value cargo, a high capacity bulk 
                  carrier must be employed to minimize the freight rate and keep 
                  the CIF cost competitive against local animal feed in European 
                  market. Thailand has no deep-sea port to accommodate such bulk 
                  carrier requiring draught 35 feet.
 |  
 |  |   
          | Thai Oil 
            Refinery Jetty, Chonburi
 |  |   
          | We 
            conceived an off-shore loading plat-form 3 km. from shore at Sri Raja 
            connected to shore with a conveyor belt bridge to a drying and storage 
            facilities of 100,000 tons capacity. 
 Our involvement consists of feasibility study, marine survey, bathymetric 
            chart, silting study, conceptual design; negotiation with mechanical 
            equipment suppliers, detailed designs, and supervision of construction.
 |  |  |   
          | 
              
                | Mah Boonkrong 
                  Drying and Silo Jetty, Chonburi
 |  |  |  |  |